Engineering & Design
What We Offer
-
Basic Engineering
- Design Basis Verification
- Conceptual Design
- Preliminary Plot Plan
- Heat and Material Balance
- P&ID
- Equipment Sizing
- Instrument Specification
- Preliminary Material selection
- Electrical Single Line Diagram
- Process Description
-
Detailed Engineering
- Equipment Mechanical calculations
- Material selection
- Piping design and stress analysis
- Plot Plan
- 3D Scanning/Modelling & Printing
- Computer Simulation of Process Flow
- Systems Performance Modelling
- Civil and structural design
- Instruments loop and wiring diagram, cable layout, control system installation details
- Electrical wiring diagram, cable layout, power distribution drawings, MCC & Switch Room details
-
Process Engineering
- Conceptual Design
- Heat And Material Balance (HMB)
- Process Flow Diagram (PFD’s)
- Process & Instrument Flow Diagram (P&ID’s)
- Utility Flow Diagram (UFD’S)
- Line Sizing, Hydraulic Calculation & Analysis
- PSV’s Sizing, Relief Load Calculation & Contingency Analysis
- Equipment & Instruments Data Sheet , Line Designation Tables
- Utility Calculation / Summary Table
- Process Description
- Process Simulation
- Material Selection Diagram (MSD’s)
- PHA , HAZOP & Safety Review /Analysis
- Corrosion Protection Systems (Paints & Coatings)
- Commissioning, Start Up, Shut Down Procedure
- Operation And Maintenance Manual (O&M)
- Process Audit
-
Mechanical Engineering
- Calculation Of Pressure Parts Thickness, Pressure Rating Specification
- Bulk Material Take-Off
- Piping Stress Analysis
- Detailed Engineering Drawings
- Welding Procedures (WPS)
- Equipment Test Procedures
- Installation Procedures Static & Rotary Equipment
-
Electrical Engineering
- Skid Edge Junction Box Specification
- Power and Instrument Cable Tray Layout and Details
- Detailed Wiring Diagrams
- Power Distribution System, Substation & OHL
- Switchgear, Power Transformer
- E-House, UPS, DC/AC System
- Single Line Diagrams (SLD), Load List, Cable Schedule/Tray Lay Out
- Bill Of Material (BOM / MTO)
- Elementary /Connection Wiring Diagrams (EWD & CWD)
- Synchronization Panel, Lighting System
- Grounding System, Single Line Diagrams (SLD)
- Cable Specification ,Cable Schedule/Tray Lay Out
- Power Distribution Design, Motor Control Centers (MCC)
- Auto Transfer System, Diesel Generator, MV & LV Motors, Fire Alarm System
- System Automation (SCADA, DCS, PLC)
- Hazardous Area Classification
- Start-Up, Commissioning and Product Support
- Process Optimization & Trouble Shooting
-
Instrumentation and Control
- Detailed Specification for Field Instruments
- Loop and wiring diagrams
- Power and Instrument Cable tray layout and details
- Logic description
- Logic diagram
- Test procedure for instruments loop
- Standard Instrumentation Installation details for off-skid instrumentation
-
Civil Engineering
- Site investigation, Feasibility study & cost analysis
- Topographical Work and Specifications
- Earth Works
- Design of Field Accommodation Buildings
- Equipment & Machinery Foundation & Concrete Structure
- Anchor Blocks for Piping
- Pipe Rack Foundations
- Rough Grading Drawings
- Finish Grading Drawings
- Equipment Foundation Drawings for Tank Farm Secondary Containment
- Evaporation Pond (off site)
- Technical Specification for Foundations
- Building Architectural & HVAC (MCC & Control room)
-
Structural Engineering
- Pipe rack structural steel drawings and details
- Standard Ladders, platforms, walkways and stairways drawings
- Structural and Architectural for the following buildings:
- MCC and electrical sub-station
- Power house
- Maintenance room
- Office, including living quarters
- Control room
- Service facilities
-
Piping Design
- Plant layout & Piping Design
- Preparation of Plot Plan
- Piping Hydraulics Calculation
- Piping Material specification
- 3D models for pipe rack and interconnecting piping
- MTO of pipe, valves and fittings
- Piping plans and elevations cut from model
- Off-skid isometrics for 1 ½” and above piping
Contact Us
If you have any additional questions, please feel free to contact our team. Our response time is usually within 24 hours.
Questions? Contact Us